Facilities and Equipment
The Texas Water and Energy Institute (TWEI) at The University of Texas Permian Basin will be co-located in the UT Permian Basin Engineering Building and in the adjacent Center for Energy and Economic Development (CEED) building. Currently, the characterization laboratory is located on the 2nd floor of Engineering building Rm. 2.207.
The UTPB Engineering Building officially opened in October 2019. The state-of-the-art building is three stories, covers 105,801 square feet, and cost $55 million.